A solar canopy is hard, disclosable infrastructure. It strengthens each centre's NABERS and sustainability position and gives Region a real Scope 2 lever for its climate reporting.
Generation on site offsets common-area load (mall lighting, HVAC, car park) and feeds the embedded networks Region already runs, on-selling power to the anchor tenants, with EV-charging revenue as demand grows.
Covered parking is a visible shopper amenity: protection from sun, heat and hail, a better arrival, and support for dwell time, foot traffic and tenant retention. Across regional QLD and NSW, that shade matters.
The same structure also carries LED lighting, security and CCTV, and is battery-ready for demand management. None of that is in the prices above, and none of it needs a separate build; the canopy is engineered to take it.
Region has committed to net zero Scope 1 and 2 emissions by FY30, to be met through operational decarbonisation with no carbon credits, and has set a FY26 milestone of 25 MW of onsite solar installed, in design or in construction. On-site generation is the most direct lever for that pathway, and it is one Region already runs, from the first array at Griffin Plaza to solar across the portfolio, on-sold to tenants through embedded networks.
The limit on rooftop solar is roof space, and much of it is already committed. The car park is where the next tranche of onsite generation lives. A canopy programme adds capacity that counts directly toward the FY26 solar target and the FY30 net zero commitment, on land Region already owns, and it stands up as hard, reportable infrastructure as Region moves to mandatory ASRS climate reporting from FY27.
These are not desktop guesses. Each canopy below was drawn to scale on the centre's actual car park and priced through our engine. Figures are preliminary, ex-GST, subject to site assessment. Across just these three: 3.3 MWp, about 4.8 GWh a year generated on site, for roughly $6.8M of base scope.
Canyon Solar factory-builds solar canopies that turn large car parks into on-site power generation and shade. We have delivered them for Woolworths, across six sites, and for IGA, AstraZeneca and CSIRO. The canopy below sits over an IGA supermarket car park, the same kind of anchor that trades across Region's portfolio.
For the main lots, the standout design is the Grand Canyon: a continuous, full-coverage canopy with no gaps over the driving lanes. It gives the highest solar density in our range and a clean roofline that makes the car park look like a designed part of the centre, not an afterthought.
Beyond the three above, we desktop-sized the wider shortlist from each centre's GLA. Together the 15 centres represent roughly 10.8 MWp and $24-29M of indicative solar canopy, a programme that can be staged centre by centre.
| Centre | Location | Anchors | System | Indicative |
|---|---|---|---|---|
| Lavington Square Drawn & priced | Lavington (Albury), NSW | Woolworths; Big W | 465 kWp | $1.11M |
| Central Highlands Marketplace Drawn & priced | Emerald, QLD | Woolworths; Big W | 1.52 MWp | $3.00M |
| Raymond Terrace Marketplace Drawn & priced | Raymond Terrace, NSW | Woolworths; Big W | 1.33 MWp | $2.67M |
| Marketplace Warner Desktop | Warner (Brisbane), QLD | Woolworths; ALDI | ~812 kWp | $1.6-2.0M |
| Brassall SC Desktop | Brassall (Ipswich), QLD | Woolworths; ALDI | ~719 kWp | $1.7-2.1M |
| Katoomba Marketplace Desktop | Katoomba, NSW | Woolworths; Big W | ~676 kWp | $1.6-1.9M |
| Mount Isa Village Desktop | Mount Isa, QLD | Coles; Kmart | ~670 kWp | $1.6-1.9M |
| Marian Town Centre Desktop | Marian (Mackay), QLD | Woolworths | ~657 kWp | $1.5-1.9M |
| Muswellbrook Fair Desktop | Muswellbrook, NSW | Coles; Harvey Norman | ~614 kWp | $1.4-1.8M |
| Belmont Central SC Desktop | Belmont (Lake Macquarie), NSW | Woolworths | ~558 kWp | $1.3-1.6M |
| Whitsunday SC Desktop | Cannonvale, QLD | Coles | ~539 kWp | $1.3-1.5M |
| Worongary Town Centre Desktop | Worongary (Gold Coast), QLD | Coles | ~496 kWp | $1.2-1.4M |
| Griffin Plaza Desktop | Griffith, NSW | Coles | ~496 kWp | $1.2-1.4M |
| Drayton Central SC Desktop | Drayton (Toowoomba), QLD | Woolworths | ~474 kWp | $1.1-1.4M |
| Greenbank SC Desktop | Greenbank, QLD | Woolworths | ~397 kWp | $0.9-1.1M |
The three centres above took minutes each. We can do the same for any site in the portfolio, live: draw the canopy to scale on the car park, size it, and price it while you watch. We can also run the full economics on your own inputs, whatever tariff, self-consumption, finance structure or target return Region wants to test, so the numbers reflect how you assess an investment rather than our assumptions.
Region holds the canopies and all the generation, on a 30-year design life, staged centre by centre across the portfolio.
$0 upfront. A service agreement arranged through an independent finance partner; Region keeps the generation and pays from the savings and revenue.
A short working session to confirm the priority centres, validate the layouts on the actual title boundaries, and firm the tariff, common-area load and revenue assumptions with Region's real figures.